Tuesday, October 13, 2009

October Odyssey -- Tuesday the 13th

One practice I've neglected to write about is that every morning before starting the day's work we have a devotion and prayer time. One of the volunteers or Habitat staff shares scripture or reflective thoughts and a prayer with the group. Then we all join hands and say, "Habitat is not a hand out (all our joined hands go out into the circle) but a hand up (joined hands are raised over our heads). This helps us remember who is giving us the strength and love necessary to tackle the day's tasks and why we are doing the work in the first place.


With a promise of cooler weather we attacked today's building goals with gusto. The cooler weather did not come but we did enjoy frequent breezes that wafted across our sweaty bodies.

As you can see, Sharon has survived the challenges of the day. We built the garage walls, including the 10 ft. header for the garage door, and completely surrounded the house with the exterior walls. The folks building today -- a new volunteer, John, a retired plumber and Jack took the day off -- worked like a well-oiled and fine-tuned machine. Everyone seemed to know what needed to be done next and anticipated others needs.







A Coopers hawk visited us just before lunch time and sat watching us as we ate Subway sandwiches. He was probably hoping a mouse or rat would try to get into the trash container. We enjoyed his presence for quite awhile.








Joanne Folsom, the Volunteer Coordinator, is telling Valarie how great we are all doing. Joanne brought us lunch.









We accomplished all we were supposed to, and then some, today. We are all tired, hot, and sweaty, but quite pleased with what we accomplished together.



Monday, October 12, 2009

October Odyssey -- Monday



The day started with rain showers and a barren concrete slab. We had plenty of willing workers and most of them were very able.









Valerie and her daughters will be the happy home owners in a month or so.









Al and Rob are discussing what needs to be done next. This is after we'd all run to the dryness of cars and trucks to escape downpours on two different occasions.

Don't suppose you, gentle readers, need to be reminded what happens after a rain and the sun emerges to beat relentlessly down upon the bent backs of the lowly worker -- that's right the heat and humidity rise exponentially.




After the rain, work progressed quickly and much was accomplished.


We got the right side wall and the long back wall built whict included two windows and two doors along with the pipes for kitchen, bathroom, and laundry room that had to be measured and cut around carefully to make everything fit.





About 2:30, it was time to clean up and organize for tomorrow. We'll probably get all of the exterior walls constructed then.










Friday, October 9, 2009

October Odyssey -- Friday


The promised electricity/air conditioning did not materialize. The power company never showed up while we were there. We worked inside all day in the stifling heat. Have you ever tried to paint the inside of a windowless bathroom and closet with no light? T'warn't easy. The future homeowners were disappointed; it meant another day to wait for the last few things that needed to be done before they could close.



Mike is pictured above trying to paint the back of a bedroom door. "Tall Rob" isn't lying down on the job; he's just trying to paint the inside of the closet door frame without bumping into the ceiling.

We painted everything ivory -- the homeowners plan to add color after they move in.





The 6 Care-A-Vanners and Jack (a future homeowner who worked with us all week) went to the Fisherman's Net in Flagler Beach for dinner and to celebrate completing a very successful work week.


October Odyssey -- Thursday


Today we worked in a house nearing completion in a Palm Coast neighborhood.

Today's jobs were installing the refrigerator and stove, cutting and installing the baseboards, caulking, and painting.







The happy home owners in their kitchen. There will be 9 family members living in this five bedroom home.










Cutting and recutting the baseboards -- mitered and coped -- point to point -- measure and remeasure. That's the way the day went.









Morning calisthenics.











Back to the same place on Friday.



Thursday, October 8, 2009

October Odyssey -- Wednesday



Another hot, hot, hot day on the job. The sun beat down on that concrete slab relentlessly. But on we worked.











We finished installing the OSB on all walls -- the nails were correctly spaced and we passed our first inspection with flying colors.

We are resting while we wait for lunch to be delivered.






We built the interior walls for the laundry
room, the storage room, a bedroom and two closets.










We wrapped the exterior walls with Tyvek and stapled it tightly.

This is the view of the front porch, front door, and left side.








Then we cleaned up and prepared to move on to another site on Thursday. Volunteers won't be back to Ruth's house for a couple of weeks. The next jobs are subcontracted out -- the trusses, the roof, and shingles.

We got off about an hour early, so we went in search of good water, ice, and other such things. The water at the campground is nasty -- smells of sulphur and has an unpleasant taste. After that task was finished, we cleaned up and prepared to head to Jax for bell choir practice at church. We stopped by the house to get a few things that we'd forgotten to bring. Dusty saw us and barked; not understanding why we didn't come get her. It would have been worse if we'd gone over to see her.

We ate dinner at a new Asian fusion bistro near the church after practice and got home just after 10 PM.

Thursday is inside work at a nearly completed house near Palm Coast. This work site is farther away so we'll have to leave earlier and as a result get up earlier than before.

Tuesday, October 6, 2009

October Odyssey -- Tuesday

The sight that greeted us this morning before we left to work at the site was gorgeous. This Great Blue Heron was stalking something. We couldn't stay to see if he got it or not.








Both of us were able to get up from the bed this morning and weren't as sore as we thought we would be. Working today was much more uncomfortable than yesterday. No cloud cover, very little breeze, hotter temperatures, and higher humidity caused us to take more water and rest breaks than yesterday. But we still got most of the OSB (a type of plywood that covers the outside of the walls) installed.


Al, the build supervisor, is in the green shirt. He's very knowledgeable, capable, and patient with us "newbees". The view shows what the site l00ked like when we left yesterday.

It rained yesterday evening; so, the first thing that we had to do was to get all the water off the slab.






Lindsey, on the left, the Executive Director of the Flagler Co. Habitat, is visiting with Ruth, the one for whom this home is being built.










Sharon is hammering down the last of the hurricane straps -- she actually climbed a ladder.













This is Frank, one of two Franks on the crew. He is a Native American and can do anything needed to get the house built.










Nailing the OSB to the wall studs was the big job for the day. It was difficult to get everything to fit and to get the nails into the wood and studs correctly. Sharon's job was to go around with a 6" block and an 8" block to mark where more nails had to be pounded in. The inspector is really a stickler that the nails along the edges be no more than 6" apart and the nails in the middle must be no more than 8" apart. Mike climbed the ladder to nail across the top and down the first six or eight inches. We got all of the OSB installed except for the back.





Ruth putting in her "sweat equity", along with the rest of us, had just about had it -- totally wiped out -- by the end of the day.











Sunday, October 4, 2009

Our October Odyssey

After a 2 month hiatus, at home -- volunteering; fighting air potatoes; getting involved in a newly organized bell choir at church; and enjoying "old" friends -- we are on the road again.

We are trying a new volunteer activity with Habitat Care-A-Vanners on a build near Bunnell, FL, a small town an hour and a half southeast of Jacksonville. We joined up with two experienced couples at the Bull Creek Campground, a Flagler Co. park. We have a full-service site on a cement pad with a swamp behind us. Hopefully we will be able to contribute to the cause -- neither of us are experienced builders but we are willing helpers. We'll be here until the 16th.

October 5, 2009, was declared World Habitat Day and the mayor of Palm Coast came out to the site to read a Proclamation. We are building a home for Ruth, a widow with 2 teenage daughters. She was there putting in her "sweat equity hours". It was a Hot, Hot, day -- overcast but the humidity was at least 100%. It was a 3-shirt day for Mike.

There were the 3 Care-A-Vanner couples and about 6 other local volunteers. The back wall was already built. We built the other four walls/sections and installed most of the Simpson straps, or hurricane straps, on all of the studs, bottom and top. Mike entered in with gusto and Sharon did the best she could -- nailing and holding and handing and carrying. The people are great; there was a great deal of good-natured bantering and joking. We even sang, "If I had a Hammer". The day starts with devotions and the good folks of Ruth's church provided lunch.

When we got back to the trailer about 3 PM we had to dry out enough to shower and then rest up after the shower in order to have enough energy to cook dinner.

Hope we can get up out of bed tomorrow.

Mike did not take any pictures yet; but we'll go ahead and post this just to let you guys know we are back.