On Sunday, October 30, the Emricks, Leighs, and Williams left Blueberry Hill and drove over the rivers and through the woods to Bunnell, FL, home of the fantastic Flagler Co. Habitat for Humanity, to participate in a one week build. We were to meet Lynn Howard at the gate to the camping area of the Flagler Co. Fairgrounds so that she could let us in. She tried and tried to open the lock; her husband tried and tried to open the lock; Jim Leigh tried and tried to open the lock, Mike tried and tried to open the lock. Finally, Jim Leigh went to his truck, got his hammer and a screwdriver and removed the cotter pins on the hinges on one side. We all moved the entire gate to one side; drove our three rigs through and followed Lynn to the place that would be our home for the week.
As you can see by the photo, we are in a very large field. Killdeer fly up and greet us as we walk around; the ants have their evil hills scattered everywhere along with piles of horse poop -- so we have to watch where we step. There is a pair of red-shouldered hawks that we see regularly who seem to enjoy harassing the killdeer. We are maybe 1/2 mile from a railroad track which we hear a couple of times a night; there is a dirt bike track nearby also -- on Sunday afternoon, Tuesday afternoon, Thursday afternoon the roar from there is worse than the trains. We have 30 amps and water; the restrooms are open and clean for us but do not have showers. But for $7 a night, we are not complaining.
Monday, the weather was good for ducks but not for building walls outside. So we followed John Knox, the Building Supervisor, to a house on Nuttwood Rd. that was framed and roofed to do a couple of inside tasks. We were done within a couple of hours and got the rest of the day off.
George, Mike, and John discuss the work for the day.
First job was to place the cupboard braces.
We built the AC stand in the storage room.
We were done lickety-split. We all had errands to run and used the early release time to do what we needed to.
We had decided that each couple would prepare their own dinner and then we would eat together.
That has worked well every evening. No leftovers this way.
Tuesday, we went back to the same house on Nuttwood Rd. Tuesday's tasks were to install the soffits and facia board all around the house.
Jim Leigh measuring for the next piece of soffit.
Jan Emrick cuts the pieces with precision.
John Knox is putting up drip edge with the help of Jim Leigh. Mike is in the background pounding nails into another piece.
The final bend is ready to be made to the drip edge on the corner.
We finished that job in record time. So after lunch, we started on the siding.
Left to right: Jan Leigh, Jan Emrick, George Dahl (a local volunteer), Cathy Emrick, and Jim Leigh relax at lunch-time on the back porch.
Mike, Jan E. Jim L. and George put the last vinyl strip on the left side of the house.
It has probably looked like the boys were doing all the work, but we ladies made all their work possible -- we were the cutters, carriers, measurers and fetchers. They couldn't have gotten as much done as they did without us.
We finished installing vinyl siding on the right and left sides of the house before 2 PM.
After work on Tuesday, Mike and Sharon drove by the first house we worked on for Flagler Habitat three years ago. Here it is -- it was gratifying to see the house finished and seeing Ruth again. She is one happy lady.
On Wednesday, we finished all of the siding and even installed the shutters on the front windows. As said before, We are the A Team. We anticipated what needed to be held, measured, pounded, whatever, and did it without being asked -- a well-oiled machine.
Lindsay brought coffee and doughnuts and words of appreciation. I think we appreciated her offering of goodies more.
Lindsay brought coffee and doughnuts and words of appreciation. I think we appreciated her offering of goodies more.
The front and back have vinyl siding installed and the shutters are also in place.
Looks pretty good!
Here's the tired but proud crew, from left to right:
Mike, Sharon, John Knox (the boss), Cathy Emrick and Jan is behind her, Jan Leigh has husband, Jim, well in hand.
We planned to go back to the first house tomorrow.
That evening, back at the camp-field, we were greeted by a tiny, hungry, skinny black kitten. She tried and tried to get into the trailers and into our hearts. She got into our hearts but no one was equipped to take her along. If fellow NHOG'er, Judy Emerson, would have been with us, that kitten would have had a home in a Boston minute.
Jan nicknamed her "Flagler", she followed us everywhere.
Look at those eyes.
The sun set and the tired builders went to bed.
Thursday morning we drove back to Sergeant Ct. On the previous days we were blessed by cool and breezy weather with some natural shade from trees. Thursday was not to be the same. Temperatures got up into the mid-80's and there was no shade to be had. The tasks today were to build and install the headers over the garage, the porch, and the main entrances, plus cover as much of the walls with plywood. The first job, though, was to finish nailing down the hurricane straps.
Looks like Mike is saying, "O.K. that job is done; what's next?"
Attaching plywood to each corner of the house.
First they had to lift the header to the tops of 4 ladders they'd set up in the garage opening.
A little higher on your side, Bob and Jim.
Whew! It fit perfectly and no one got squashed.
Joanna dropped by with new Habitat t-shirts for all of us. Thank you. We got all of the corners covered with plywood before we were through for the day. John Knox told us he would not be able to be on the job site tomorrow, so we finished a day early. After the heat of the day we were ready to quit.
Back "home", we checked on "Flagler" -- yes, she was still there greeting us with "her-welcome-back-where-have-you-been?" meows. She'd spent the day napping on the Leigh's kayaks. Then showered and ready to go again, Jan E. helped Mike caulk/repair some leaky areas on top of our rig. It is so wonderful being associated with people who know how to do stuff we don't.
Then we jumped in our trucks and headed for Flagler Beach and the Flagler Fish Co. for dinner. No one wanted to cook tonight and 'sides we were celebrating a job well-done.
George and Eleanore got there ahead of us and requested a table for eight. The restaurant is also a fish market, so a patron was able to go right up to the counter and pick out the desired piece of fish.
The whole crew of volunteers. We all (except Eleanore) wore our new, green Habitat shirts that we were given today. The words printed on the backs of the shirts say it all:
"Recipe for Flagler Habitat for Humanity Volunteers and Homeowners:
1 part blood
1 part sweat
1 part tears
Add lots of love and dedication
Season with humor, hugs, and blessings and mix well.
Bake in 80-90 degree heat for approximately 8 hours each build day. Serves an entire community." Marie, one of the homeowners wrote this.
The Williamses and the Emricks left on Friday morning, the Leighs did some laundry, sightseeing, and taking care of Flagler (they even bought some cat food). They will either take her to the Humane Society or move her closer to the ball fields where someone will surely take her home before they leave on Saturday.
We got home just before noon; unloaded the truck and trailer; did 4 loads of laundry; and Mike fiberglassed the holes he discovered in the AC shroud. We took the rig back to its storage bed until the next outing.




No comments: